RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026837 - Archived data from Wed, 03. February 2021 18:16:05 CET


This is all the information about APD 2412026837. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026837
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2412026837/2410026697
Unit: #882 (barcode 1309009732)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 17
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 10 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.057633 V     T = -25 °C: 346.5609981 V
Voltage for Gain 150: T = +20 °C: 389.9568697 V     T = -25 °C: 354.050908 V
Voltage for Gain 200: T = +20 °C: 394.3578918 V     T = -25 °C: 358.2434247 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.453951451 V-1     T = -25 °C: 4.90655251 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.551826099 V-1     T = -25 °C: 8.89690522 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35453466 V-1     T = -25 °C: 15.22328633 V-1
Break-through voltage: T = +20 °C: 409.5540224 V     T = -25 °C: 373.2872584 V
   
Notes: foam


Version history

Time Author Change comment
05. Feb 2021 10:49:55 CET jreher Updated box and position via API.
03. Feb 2021 18:16:05 CET jreher Updated box and position via API.
11. Aug 2020 17:22:27 CEST jreher Updated APD characteristics via API.
27. Mar 2020 11:32:41 CET jreher Assigned to capsule by script
13. Feb 2020 15:25:41 CET jreher Updated box and position via API.
27. Nov 2019 19:32:24 CET jreher Updated APD location via API.
25. Nov 2019 17:12:12 CET jreher Updated box and position via API.
04. Jul 2019 11:08:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:08 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:37 CET Tobias Corrected dark current unit.
26. Nov 2018 12:29:50 CET markus.moritz
16. Nov 2018 12:19:42 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.