RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026833 - Archived data from Tue, 11. August 2020 17:22:26 CEST


This is all the information about APD 2412026833. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026833
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 16
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4344988 V     T = -25 °C: 345.0583675 V
Voltage for Gain 150: T = +20 °C: 388.3175825 V     T = -25 °C: 352.4809325 V
Voltage for Gain 200: T = +20 °C: 392.7306551 V     T = -25 °C: 356.6654806 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.6560647 V-1     T = -25 °C: 4.733558469 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.917883812 V-1     T = -25 °C: 9.294881308 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02943509 V-1     T = -25 °C: 15.99699324 V-1
Break-through voltage: T = +20 °C: 408.5282766 V     T = -25 °C: 372.1192593 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:52 CET jreher Updated box and position via API.
03. Feb 2021 18:16:02 CET jreher Updated box and position via API.
11. Aug 2020 17:22:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:17 CET jreher Updated APD location via API.
25. Nov 2019 17:12:11 CET jreher Updated box and position via API.
04. Jul 2019 11:08:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:08 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:37 CET Tobias Corrected dark current unit.
13. Dec 2018 13:42:44 CET markus.moritz
16. Nov 2018 15:38:19 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.