RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026802 - Archived data from Tue, 11. August 2020 17:22:24 CEST


This is all the information about APD 2411026802. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026802
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2411026742/2411026802
Unit: #1004 (barcode 1309009565)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 16
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9205883 V     T = -25 °C: 346.4073851 V
Voltage for Gain 150: T = +20 °C: 389.7831992 V     T = -25 °C: 353.8425583 V
Voltage for Gain 200: T = +20 °C: 394.1710444 V     T = -25 °C: 358.0313499 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.565300662 V-1     T = -25 °C: 4.695145642 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.873541065 V-1     T = -25 °C: 9.297042927 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21637224 V-1     T = -25 °C: 16.24730808 V-1
Break-through voltage: T = +20 °C: 409.6308378 V     T = -25 °C: 373.5328394 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:51 CET jreher Updated box and position via API.
03. Feb 2021 18:16:01 CET jreher Updated box and position via API.
11. Aug 2020 17:22:24 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:07 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:30 CET jreher Updated box and position via API.
27. Nov 2019 19:32:16 CET jreher Updated APD location via API.
25. Nov 2019 17:12:10 CET jreher Updated box and position via API.
04. Jul 2019 11:08:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:33 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:07 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:36 CET Tobias Corrected dark current unit.
13. Dec 2018 13:31:46 CET markus.moritz
16. Nov 2018 15:41:25 CET markus.moritz
12. Jan 2018 13:11:44 CET Tobias Imported from Hamamatsu datasheet.