RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026780 - Archived data from Wed, 07. October 2020 12:28:11 CEST


This is all the information about APD 2411026780. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026780
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2516028793/2411026780
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 5 nA
   
Screening Logistics:  
Available: No
Storage Box: 16
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.0509948 V     T = -25 °C: 350.1323166 V
Voltage for Gain 150: T = +20 °C: 393.947471 V     T = -25 °C: 357.6651827 V
Voltage for Gain 200: T = +20 °C: 398.3260213 V     T = -25 °C: 361.8744478 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.519205117 V-1     T = -25 °C: 4.700386478 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.628124543 V-1     T = -25 °C: 9.785375538 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.80942952 V-1     T = -25 °C: 15.26748215 V-1
Break-through voltage: T = +20 °C: 414.0614337 V     T = -25 °C: 377.3014094 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:48 CET jreher Updated box and position via API.
03. Feb 2021 18:15:58 CET jreher Updated box and position via API.
07. Oct 2020 12:28:11 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:40 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:14 CET jreher Updated APD location via API.
25. Nov 2019 17:12:08 CET jreher Updated box and position via API.
04. Jul 2019 11:08:22 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:31 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:35 CET Tobias Corrected dark current unit.
13. Dec 2018 13:14:21 CET markus.moritz
23. Nov 2018 11:50:09 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.