RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026774 - Archived data from Wed, 03. February 2021 18:15:57 CET


This is all the information about APD 2411026774. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026774
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2411026774/2401025910
Unit: #1008 (barcode 1309009589)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 16
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0207605 V     T = -25 °C: 346.4426153 V
Voltage for Gain 150: T = +20 °C: 389.8511432 V     T = -25 °C: 353.8690745 V
Voltage for Gain 200: T = +20 °C: 394.2120813 V     T = -25 °C: 358.0666068 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.611011294 V-1     T = -25 °C: 4.708385544 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.163078185 V-1     T = -25 °C: 9.383038818 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67978788 V-1     T = -25 °C: 14.93091889 V-1
Break-through voltage: T = +20 °C: 409.9225717 V     T = -25 °C: 373.448275 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:48 CET jreher Updated box and position via API.
03. Feb 2021 18:15:57 CET jreher Updated box and position via API.
11. Aug 2020 17:22:19 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:44:09 CEST jreher Assigned to capsule by script
13. Feb 2020 15:25:30 CET jreher Updated box and position via API.
27. Nov 2019 19:32:14 CET jreher Updated APD location via API.
25. Nov 2019 17:12:08 CET jreher Updated box and position via API.
04. Jul 2019 11:08:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:09:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:35 CET Tobias Corrected dark current unit.
13. Dec 2018 13:08:58 CET markus.moritz
23. Nov 2018 11:51:37 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.