RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026765 - Archived data from Wed, 03. February 2021 18:15:56 CET


This is all the information about APD 2411026765. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026765
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 16
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5940246 V     T = -25 °C: 346.2904759 V
Voltage for Gain 150: T = +20 °C: 389.4290659 V     T = -25 °C: 353.719769 V
Voltage for Gain 200: T = +20 °C: 393.800253 V     T = -25 °C: 357.8989396 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.632846927 V-1     T = -25 °C: 4.644526816 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.983995723 V-1     T = -25 °C: 9.181835326 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32193665 V-1     T = -25 °C: 15.7737602 V-1
Break-through voltage: T = +20 °C: 409.5870317 V     T = -25 °C: 373.1414418 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:47 CET jreher Updated box and position via API.
03. Feb 2021 18:15:56 CET jreher Updated box and position via API.
11. Aug 2020 17:22:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:13 CET jreher Updated APD location via API.
25. Nov 2019 17:12:07 CET jreher Updated box and position via API.
04. Jul 2019 11:08:21 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:53 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:35 CET Tobias Corrected dark current unit.
13. Dec 2018 13:05:45 CET markus.moritz
23. Nov 2018 11:53:43 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.