RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2411026759 - Archived data from Wed, 03. February 2021 18:15:54 CET


This is all the information about APD 2411026759. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2411026759
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 2.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 15
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0701281 V     T = -25 °C: 349.3637161 V
Voltage for Gain 150: T = +20 °C: 392.9107259 V     T = -25 °C: 356.8736438 V
Voltage for Gain 200: T = +20 °C: 397.2681631 V     T = -25 °C: 361.0835883 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.468847645 V-1     T = -25 °C: 4.926943397 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.546928083 V-1     T = -25 °C: 8.875839412 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38850803 V-1     T = -25 °C: 15.14505441 V-1
Break-through voltage: T = +20 °C: 411.7777206 V     T = -25 °C: 375.8375975 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:43 CET jreher Updated box and position via API.
03. Feb 2021 18:15:54 CET jreher Updated box and position via API.
11. Aug 2020 17:22:16 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:05 CET jreher Updated APD location via API.
25. Nov 2019 17:12:06 CET jreher Updated box and position via API.
25. Jul 2019 10:30:09 CEST jreher
04. Jul 2019 11:08:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:34 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:29 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:52 CEST jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:34 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:13:22 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:25 CET jreher Updated APD batch assignment via API.
15. Feb 2019 14:12:02 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:58:09 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:57:43 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:54:39 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:52:19 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:49 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:51:21 CET jreher Updated APD batch assignment via API.
15. Feb 2019 13:48:40 CET jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:34 CET Tobias Corrected dark current unit.
13. Dec 2018 10:59:05 CET markus.moritz
13. Dec 2018 10:58:33 CET markus.moritz
23. Nov 2018 14:10:15 CET markus.moritz
12. Jan 2018 13:11:43 CET Tobias Imported from Hamamatsu datasheet.