Show Hamamatsu Avalanche Photo Diode 2411026748 - Archived data from Fri, 15. February 2019 14:12:01 CET
This is all the information about APD 2411026748. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2411026748 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | unknown |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | C10 |
| Break-through voltage: | 411 V |
| Voltage for Gain 100 (T=+25°C): | 382.5 V |
| Dark current: | 6.3 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 15 |
| Position in Box: | 35 |
| EP1 batch: | 40 |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 12. Nov 2018 |
| Sent for analysis after irradiation: | 13. Dec 2018 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 07. Dec 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 10. Dec 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:49:42 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:15:52 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:22:14 CEST | jreher | Updated APD characteristics via API. |
| 13. Feb 2020 14:42:39 CET | jreher | Updated box and position via API. |
| 27. Nov 2019 19:32:05 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:12:05 CET | jreher | Updated box and position via API. |
| 25. Jul 2019 10:28:15 CEST | jreher | |
| 15. Jul 2019 15:49:30 CEST | jreher | Assigned to unit by script |
| 15. Jul 2019 15:26:59 CEST | jreher | Assigned to capsule by script |
| 04. Jul 2019 11:08:15 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:46:33 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:31:28 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 15:03:51 CEST | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 14:13:33 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 14:13:21 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 14:12:24 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 14:12:01 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:58:08 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:57:42 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:54:38 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:52:18 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:51:48 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:51:20 CET | jreher | Updated APD batch assignment via API. |
| 15. Feb 2019 13:48:39 CET | jreher | Updated APD batch assignment via API. |
| 03. Jan 2019 00:11:34 CET | Tobias | Corrected dark current unit. |
| 13. Dec 2018 11:11:01 CET | markus.moritz | |
| 23. Nov 2018 14:13:24 CET | markus.moritz | |
| 12. Jan 2018 13:11:43 CET | Tobias | Imported from Hamamatsu datasheet. |