RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2410026701 - Archived data from Wed, 03. February 2021 18:15:49 CET


This is all the information about APD 2410026701. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2410026701
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2410026701/2405026293
Unit: #1275 (barcode 1309013463)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 15
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 13. Dec 2018
Return for assembly: none
   
Irradiation:  
Date: 07. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0362312 V     T = -25 °C: 346.5418892 V
Voltage for Gain 150: T = +20 °C: 389.924674 V     T = -25 °C: 353.9477943 V
Voltage for Gain 200: T = +20 °C: 394.3145189 V     T = -25 °C: 358.1682692 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.562217581 V-1     T = -25 °C: 4.680690155 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.830512616 V-1     T = -25 °C: 9.263594283 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.49875749 V-1     T = -25 °C: 13.83314798 V-1
Break-through voltage: T = +20 °C: 409.8908487 V     T = -25 °C: 373.3839309 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:49:39 CET jreher Updated box and position via API.
03. Feb 2021 18:15:49 CET jreher Updated box and position via API.
11. Aug 2020 17:22:09 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:26:01 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:34 CET jreher Updated box and position via API.
27. Nov 2019 19:32:03 CET jreher Updated APD location via API.
25. Nov 2019 17:12:03 CET jreher Updated box and position via API.
04. Jul 2019 11:08:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:30 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:25 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:03:43 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:33 CET Tobias Corrected dark current unit.
13. Dec 2018 11:57:27 CET markus.moritz
23. Nov 2018 14:20:13 CET markus.moritz
12. Jan 2018 13:11:42 CET Tobias Imported from Hamamatsu datasheet.