Show Hamamatsu Avalanche Photo Diode 2318025714 - Archived data from Tue, 11. August 2020 17:41:21 CEST
This is all the information about APD 2318025714. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2318025714 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | G13 |
| Break-through voltage: | 421 V |
| Voltage for Gain 100 (T=+25°C): | 393.2 V |
| Dark current: | 10.6 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 234 |
| Position in Box: | 6 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 392.8017813 V T = -25 °C: 356.1179875 V |
| Voltage for Gain 150: | T = +20 °C: 400.6586219 V T = -25 °C: 363.7605849 V |
| Voltage for Gain 200: | T = +20 °C: 405.0037613 V T = -25 °C: 368.0416095 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.64227747 V-1 T = -25 °C: 4.708120336 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.342043471 V-1 T = -25 °C: 9.417860411 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.54515336 V-1 T = -25 °C: 14.6956401 V-1 |
| Break-through voltage: | T = +20 °C: 421.8050444 V T = -25 °C: 383.4587019 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 11:18:25 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:41:21 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:29:57 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:03 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:14 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:24 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:58:31 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:57:30 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:10:27 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:29:02 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 12:56:08 CEST | spankonin | Updated APD location via API. |
| 18. Oct 2019 14:04:36 CEST | jgrochowski | Updated APD batch assignment via API. |
| 23. Jun 2016 12:00:15 CEST | Tobias | Imported from Hamamatsu datasheet. |