Show Hamamatsu Avalanche Photo Diode 2318025701 - Archived data from Tue, 11. August 2020 17:41:18 CEST
This is all the information about APD 2318025701. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2318025701 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | C12 |
| Break-through voltage: | 419 V |
| Voltage for Gain 100 (T=+25°C): | 391.1 V |
| Dark current: | 8.1 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 230 |
| Position in Box: | 40 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 391.5812337 V T = -25 °C: 355.1997908 V |
| Voltage for Gain 150: | T = +20 °C: 399.4204267 V T = -25 °C: 362.7463034 V |
| Voltage for Gain 200: | T = +20 °C: 403.7575204 V T = -25 °C: 366.9634077 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.399468731 V-1 T = -25 °C: 4.745636278 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.633951693 V-1 T = -25 °C: 9.551618861 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.07523777 V-1 T = -25 °C: 15.03545277 V-1 |
| Break-through voltage: | T = +20 °C: 417.9681113 V T = -25 °C: 381.5066688 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 11:17:58 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:41:18 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:29:19 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:02 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:12 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:23 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:58:30 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:57:29 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:09:45 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:28:46 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 12:54:27 CEST | spankonin | Updated APD location via API. |
| 18. Oct 2019 14:03:24 CEST | jgrochowski | Updated APD batch assignment via API. |
| 23. Jun 2016 12:00:14 CEST | Tobias | Imported from Hamamatsu datasheet. |