RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2317025586 - Archived data from Tue, 11. August 2020 17:41:55 CEST


This is all the information about APD 2317025586. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2317025586
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2317025586/2001021494
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 233
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5421305 V     T = -25 °C: 343.3626934 V
Voltage for Gain 150: T = +20 °C: 386.3409575 V     T = -25 °C: 350.6987099 V
Voltage for Gain 200: T = +20 °C: 390.6954329 V     T = -25 °C: 354.807128 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.474234226 V-1     T = -25 °C: 4.841283694 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.737711937 V-1     T = -25 °C: 9.866026657 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.25409723 V-1     T = -25 °C: 15.85125433 V-1
Break-through voltage: T = +20 °C: 406.5742231 V     T = -25 °C: 370.3225547 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:20 CET jreher Updated box and position via API.
11. Aug 2020 17:41:55 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:49 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:56 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:26 CET jreher Updated box and position via API.
16. Jan 2020 12:05:55 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:06 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:16 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:20 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:22 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:18 CET jreher Updated APD location via API.
25. Nov 2019 17:29:00 CET jreher Updated box and position via API.
22. Oct 2019 13:08:18 CEST spankonin Updated APD location via API.
18. Oct 2019 14:14:33 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:11 CEST Tobias Imported from Hamamatsu datasheet.