RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2316025518 - Archived data from Tue, 11. August 2020 17:42:30 CEST


This is all the information about APD 2316025518. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2316025518
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 220
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6480846 V     T = -25 °C: 350.013712 V
Voltage for Gain 150: T = +20 °C: 393.4892318 V     T = -25 °C: 357.4529957 V
Voltage for Gain 200: T = +20 °C: 397.8315098 V     T = -25 °C: 361.599357 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.392789766 V-1     T = -25 °C: 4.891014084 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.583126692 V-1     T = -25 °C: 9.047781726 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96015359 V-1     T = -25 °C: 16.14668484 V-1
Break-through voltage: T = +20 °C: 412.0906911 V     T = -25 °C: 376.0162383 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:02:52 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:25 CET jreher Updated box and position via API.
05. Feb 2021 11:16:40 CET jreher Updated box and position via API.
11. Aug 2020 17:42:30 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:37 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:50 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:01 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:11 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:12 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:17 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:55 CET jreher Updated APD location via API.
25. Nov 2019 17:28:01 CET jreher Updated box and position via API.
22. Oct 2019 16:33:30 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:26:22 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:12:02 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:09 CEST Tobias Imported from Hamamatsu datasheet.