RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2316025490 - Archived data from Tue, 11. August 2020 17:42:25 CEST


This is all the information about APD 2316025490. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2316025490
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 226
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9507945 V     T = -25 °C: 346.3175059 V
Voltage for Gain 150: T = +20 °C: 389.7738769 V     T = -25 °C: 353.7057642 V
Voltage for Gain 200: T = +20 °C: 394.1323803 V     T = -25 °C: 357.8241937 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.63176458 V-1     T = -25 °C: 4.802485149 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.191937571 V-1     T = -25 °C: 9.825784069 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25773125 V-1     T = -25 °C: 15.69278383 V-1
Break-through voltage: T = +20 °C: 408.9155249 V     T = -25 °C: 372.5594506 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:17:31 CET jreher Updated box and position via API.
07. Oct 2020 12:13:01 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:27 CEST jreher Updated box and position via API.
11. Aug 2020 17:42:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:45 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:48 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:59 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:09 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:08 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:15 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:04 CET jreher Updated APD location via API.
25. Nov 2019 17:28:31 CET jreher Updated box and position via API.
22. Oct 2019 16:25:55 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:10:07 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:08 CEST Tobias Imported from Hamamatsu datasheet.