RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2315025394 - Archived data from Fri, 05. February 2021 11:17:28 CET


This is all the information about APD 2315025394. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2315025394
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 226
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6896963 V     T = -25 °C: 343.439564 V
Voltage for Gain 150: T = +20 °C: 386.4543036 V     T = -25 °C: 350.7947355 V
Voltage for Gain 200: T = +20 °C: 390.7677679 V     T = -25 °C: 354.8946975 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441968802 V-1     T = -25 °C: 4.825088444 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.647825824 V-1     T = -25 °C: 9.765904072 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.08140269 V-1     T = -25 °C: 15.59441263 V-1
Break-through voltage: T = +20 °C: 406.5099556 V     T = -25 °C: 370.3226356 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:45:28 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:17:28 CET jreher Updated box and position via API.
18. Dec 2020 14:01:19 CET jreher Updated box and position via API.
11. Aug 2020 17:42:20 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:43 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:46 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:57 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:07 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:04 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:12 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:02 CET jreher Updated APD location via API.
25. Nov 2019 17:28:29 CET jreher Updated box and position via API.
22. Oct 2019 16:25:24 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:10:04 CEST spankonin Updated APD location via API.
23. Jun 2016 11:59:15 CEST Tobias Imported from Hamamatsu datasheet.