RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2314025367 - Archived data from Tue, 11. August 2020 17:41:09 CEST


This is all the information about APD 2314025367. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2314025367
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2314025367/2303024399
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 231
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2339521 V     T = -25 °C: 351.3383389 V
Voltage for Gain 150: T = +20 °C: 395.0987469 V     T = -25 °C: 358.8590818 V
Voltage for Gain 200: T = +20 °C: 399.4796098 V     T = -25 °C: 363.0737897 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.505592401 V-1     T = -25 °C: 4.729301954 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.858764403 V-1     T = -25 °C: 9.395934618 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51202348 V-1     T = -25 °C: 15.00512773 V-1
Break-through voltage: T = +20 °C: 414.5380594 V     T = -25 °C: 378.5508641 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:06 CET jreher Updated box and position via API.
11. Aug 2020 17:41:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:29 CEST jreher Updated box and position via API.
03. Apr 2020 09:59:29 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:18 CET jreher Updated box and position via API.
16. Jan 2020 12:05:45 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:55 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:05 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:01 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:11 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:56 CET jreher Updated APD location via API.
25. Nov 2019 17:28:51 CET jreher Updated box and position via API.
22. Oct 2019 13:37:34 CEST spankonin Updated APD location via API.
22. Oct 2019 12:50:41 CEST spankonin Updated APD location via API.
18. Oct 2019 14:02:15 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:59:14 CEST Tobias Imported from Hamamatsu datasheet.