RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2314025355 - Archived data from Tue, 11. August 2020 17:41:07 CEST


This is all the information about APD 2314025355. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2314025355
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2804031119/2314025355
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 231
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8662988 V     T = -25 °C: 347.4457543 V
Voltage for Gain 150: T = +20 °C: 390.7027751 V     T = -25 °C: 354.8867646 V
Voltage for Gain 200: T = +20 °C: 395.0566931 V     T = -25 °C: 359.054351 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.679287778 V-1     T = -25 °C: 4.756029776 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.222083633 V-1     T = -25 °C: 9.514298101 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38752565 V-1     T = -25 °C: 14.98798377 V-1
Break-through voltage: T = +20 °C: 404.8831285 V     T = -25 °C: 374.3349065 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:05 CET jreher Updated box and position via API.
11. Aug 2020 17:41:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:29 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:31 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:09 CET jreher Updated box and position via API.
16. Jan 2020 12:05:44 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:54 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:04 CET jreher Updated irradiation info via API.
16. Jan 2020 11:57:59 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:10 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:55 CET jreher Updated APD location via API.
25. Nov 2019 17:28:50 CET jreher Updated box and position via API.
22. Oct 2019 13:37:33 CEST spankonin Updated APD location via API.
22. Oct 2019 12:50:40 CEST spankonin Updated APD location via API.
18. Oct 2019 13:58:55 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:59:13 CEST Tobias Imported from Hamamatsu datasheet.