RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2314025324 - Archived data from Mon, 26. April 2021 14:28:04 CEST


This is all the information about APD 2314025324. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2314025324
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 23
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3830675 V     T = -25 °C: 344.2291046 V
Voltage for Gain 150: T = +20 °C: 387.2106569 V     T = -25 °C: 351.5987643 V
Voltage for Gain 200: T = +20 °C: 391.5774128 V     T = -25 °C: 355.7313734 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492835601 V-1     T = -25 °C: 4.84075262 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.764442051 V-1     T = -25 °C: 9.909465271 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2201996 V-1     T = -25 °C: 15.63030449 V-1
Break-through voltage: T = +20 °C: 405.9883964 V     T = -25 °C: 371.1525379 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:04 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:13 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:28:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:11 CET jreher Updated box and position via API.
11. Aug 2020 17:42:08 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:58 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:41 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:52 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:02 CET jreher Updated irradiation info via API.
16. Jan 2020 11:57:55 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:07 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:13 CET jreher Updated APD location via API.
25. Nov 2019 17:27:45 CET jreher Updated box and position via API.
28. Oct 2019 11:13:08 CET jreher Updated APD location via API.
22. Oct 2019 16:24:33 CEST spankonin Updated APD batch assignment via API.
23. Jun 2016 11:59:12 CEST Tobias Imported from Hamamatsu datasheet.