RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2313025263 - Archived data from Tue, 11. August 2020 17:41:56 CEST


This is all the information about APD 2313025263. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2313025263
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2408026539/2313025263
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 233
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.3411644 V     T = -25 °C: 347.8783716 V
Voltage for Gain 150: T = +20 °C: 391.1682735 V     T = -25 °C: 355.3156081 V
Voltage for Gain 200: T = +20 °C: 395.5271482 V     T = -25 °C: 359.4890277 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.511118533 V-1     T = -25 °C: 4.946791656 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.896225064 V-1     T = -25 °C: 9.158320308 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.61393807 V-1     T = -25 °C: 16.32242122 V-1
Break-through voltage: T = +20 °C: 411.0023237 V     T = -25 °C: 375.0053694 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:21 CET jreher Updated box and position via API.
11. Aug 2020 17:41:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:49 CEST jreher Updated box and position via API.
31. Mar 2020 08:52:20 CEST jreher Assigned to capsule by script
13. Feb 2020 13:37:22 CET jreher Updated box and position via API.
16. Jan 2020 12:05:38 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:48 CET jreher Updated annealing info via API.
16. Jan 2020 12:00:58 CET jreher Updated irradiation info via API.
16. Jan 2020 11:57:48 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:03 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:18 CET jreher Updated APD location via API.
25. Nov 2019 17:29:00 CET jreher Updated box and position via API.
22. Oct 2019 13:08:18 CEST spankonin Updated APD location via API.
18. Oct 2019 14:14:34 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:59:11 CEST Tobias Imported from Hamamatsu datasheet.