RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2312025154 - Archived data from Fri, 05. February 2021 11:16:00 CET


This is all the information about APD 2312025154. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2312025154
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3292108 V     T = -25 °C: 347.2649907 V
Voltage for Gain 150: T = +20 °C: 389.219528 V     T = -25 °C: 354.7582543 V
Voltage for Gain 200: T = +20 °C: 393.6184674 V     T = -25 °C: 359.0282707 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.485060572 V-1     T = -25 °C: 4.856643744 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.676468171 V-1     T = -25 °C: 9.580776542 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95046484 V-1     T = -25 °C: 15.57241791 V-1
Break-through voltage: T = +20 °C: 410.0760686 V     T = -25 °C: 373.1521961 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:27 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:00 CET jreher Updated box and position via API.
11. Aug 2020 17:45:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:46 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:00 CET jreher Updated APD location via API.
25. Nov 2019 17:27:38 CET jreher Updated box and position via API.
11. Nov 2019 18:43:15 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:27:34 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:08 CEST Tobias Imported from Hamamatsu datasheet.