RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2312025144 - Archived data from Fri, 05. February 2021 11:16:03 CET


This is all the information about APD 2312025144. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2312025144
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4722381 V     T = -25 °C: 346.9344587 V
Voltage for Gain 150: T = +20 °C: 390.3708379 V     T = -25 °C: 354.3882186 V
Voltage for Gain 200: T = +20 °C: 394.7664574 V     T = -25 °C: 358.574599 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43441348 V-1     T = -25 °C: 4.928081451 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.603645114 V-1     T = -25 °C: 9.105892812 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83371522 V-1     T = -25 °C: 16.1202513 V-1
Break-through voltage: T = +20 °C: 410.6648789 V     T = -25 °C: 374.2740497 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:03 CET jreher Updated box and position via API.
11. Aug 2020 17:45:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:48 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:02 CET jreher Updated APD location via API.
25. Nov 2019 17:27:40 CET jreher Updated box and position via API.
11. Nov 2019 18:48:36 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:27:36 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:07 CEST Tobias Imported from Hamamatsu datasheet.