RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2311025036 - Archived data from Fri, 05. February 2021 11:16:28 CET


This is all the information about APD 2311025036. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2311025036
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.9696953 V     T = -25 °C: 348.1955454 V
Voltage for Gain 150: T = +20 °C: 391.8647299 V     T = -25 °C: 355.7133691 V
Voltage for Gain 200: T = +20 °C: 396.2546686 V     T = -25 °C: 359.9311727 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607965874 V-1     T = -25 °C: 4.748266681 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.013067026 V-1     T = -25 °C: 9.537509442 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92526529 V-1     T = -25 °C: 15.02204425 V-1
Break-through voltage: T = +20 °C: 411.1386698 V     T = -25 °C: 375.382923 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:28 CET jreher Updated box and position via API.
11. Aug 2020 17:45:59 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:20 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:35 CET jreher Updated APD location via API.
25. Nov 2019 17:27:54 CET jreher Updated box and position via API.
11. Nov 2019 19:03:38 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:30:17 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:05 CEST Tobias Imported from Hamamatsu datasheet.