RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2311025033 - Archived data from Tue, 11. August 2020 17:45:59 CEST


This is all the information about APD 2311025033. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2311025033
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8562049 V     T = -25 °C: 346.3480574 V
Voltage for Gain 150: T = +20 °C: 389.680483 V     T = -25 °C: 353.7329042 V
Voltage for Gain 200: T = +20 °C: 394.0260112 V     T = -25 °C: 357.872937 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.656830433 V-1     T = -25 °C: 4.740657521 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.173961415 V-1     T = -25 °C: 9.658644853 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35927605 V-1     T = -25 °C: 15.27264799 V-1
Break-through voltage: T = +20 °C: 409.7280418 V     T = -25 °C: 373.3358597 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:28 CET jreher Updated box and position via API.
11. Aug 2020 17:45:59 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:19 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:35 CET jreher Updated APD location via API.
25. Nov 2019 17:27:54 CET jreher Updated box and position via API.
11. Nov 2019 19:03:38 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:30:17 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:04 CEST Tobias Imported from Hamamatsu datasheet.