RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2311025023 - Archived data from Tue, 11. August 2020 17:45:57 CEST


This is all the information about APD 2311025023. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2311025023
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3423935 V     T = -25 °C: 346.2146591 V
Voltage for Gain 150: T = +20 °C: 389.1523327 V     T = -25 °C: 353.6843053 V
Voltage for Gain 200: T = +20 °C: 393.5061339 V     T = -25 °C: 357.7934614 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502641077 V-1     T = -25 °C: 4.846717725 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.870070871 V-1     T = -25 °C: 9.510870944 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55010914 V-1     T = -25 °C: 15.79373034 V-1
Break-through voltage: T = +20 °C: 410.4872067 V     T = -25 °C: 372.7597873 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:27 CET jreher Updated box and position via API.
11. Aug 2020 17:45:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:19 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:34 CET jreher Updated APD location via API.
25. Nov 2019 17:27:53 CET jreher Updated box and position via API.
11. Nov 2019 19:03:37 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:30:16 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:04 CEST Tobias Imported from Hamamatsu datasheet.