RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0720006919 - Archived data from Fri, 05. February 2021 10:55:01 CET


This is all the information about APD 0720006919. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0720006919
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 52
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9692419 V     T = -25 °C: 345.7522883 V
Voltage for Gain 150: T = +20 °C: 388.789117 V     T = -25 °C: 353.082019 V
Voltage for Gain 200: T = +20 °C: 393.296579 V     T = -25 °C: 357.2095821 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660726768 V-1     T = -25 °C: 4.982949768 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.772363031 V-1     T = -25 °C: 9.288504186 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 11.55649957 V-1     T = -25 °C: 14.64634405 V-1
Break-through voltage: T = +20 °C: 397.2255847 V     T = -25 °C: 370.8985587 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:55:01 CET jreher Updated box and position via API.
03. Feb 2021 18:20:37 CET jreher Updated box and position via API.
11. Aug 2020 17:27:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:53 CET jreher Updated APD location via API.
25. Nov 2019 17:15:00 CET jreher Updated box and position via API.
04. Jul 2019 11:12:17 CEST jreher Updated APD location via API.
17. Jun 2019 17:50:58 CEST spankonin Updated APD batch assignment via API.
04. Jun 2019 15:15:04 CEST markus.moritz
22. Jun 2016 15:13:22 CEST Tobias Imported from Hamamatsu datasheet.