RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0720006902 - Archived data from Tue, 06. October 2020 16:52:32 CEST


This is all the information about APD 0720006902. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0720006902
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 12.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 52
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6844723 V     T = -25 °C: 350.0157936 V
Voltage for Gain 150: T = +20 °C: 393.5088854 V     T = -25 °C: 357.4154073 V
Voltage for Gain 200: T = +20 °C: 397.851519 V     T = -25 °C: 361.5967893 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.571957896 V-1     T = -25 °C: 4.740977562 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.863782328 V-1     T = -25 °C: 9.35196452 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04939313 V-1     T = -25 °C: 16.11952312 V-1
Break-through voltage: T = +20 °C: 409.0130999 V     T = -25 °C: 376.7253428 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:00 CET jreher Updated box and position via API.
03. Feb 2021 18:20:35 CET jreher Updated box and position via API.
29. Jan 2021 10:27:03 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:32 CEST jreher Updated box and position via API.
11. Aug 2020 17:27:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:52 CET jreher Updated APD location via API.
25. Nov 2019 17:14:59 CET jreher Updated box and position via API.
04. Jul 2019 11:12:16 CEST jreher Updated APD location via API.
18. Jun 2019 13:34:39 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 15:00:41 CEST markus.moritz
22. Jun 2016 15:13:21 CEST Tobias Imported from Hamamatsu datasheet.