RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2307024744 - Archived data from Tue, 11. August 2020 17:44:11 CEST


This is all the information about APD 2307024744. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2307024744
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2307024744/2510028281
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 212
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0424061 V     T = -25 °C: 345.7475454 V
Voltage for Gain 150: T = +20 °C: 388.8899952 V     T = -25 °C: 353.0995796 V
Voltage for Gain 200: T = +20 °C: 393.2759578 V     T = -25 °C: 357.2353146 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.573019004 V-1     T = -25 °C: 5.025080144 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.017647471 V-1     T = -25 °C: 9.380457056 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.93451944 V-1     T = -25 °C: 14.7971481 V-1
Break-through voltage: T = +20 °C: 409.1440059 V     T = -25 °C: 372.8064987 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:40 CET jreher Updated box and position via API.
11. Aug 2020 17:44:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:18 CEST jreher Updated box and position via API.
03. Apr 2020 09:45:24 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:22 CET jreher Updated box and position via API.
27. Nov 2019 20:06:29 CET jreher Updated APD location via API.
25. Nov 2019 17:27:24 CET jreher Updated box and position via API.
31. Oct 2019 17:10:50 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:59:21 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:09 CEST Tobias Imported from Hamamatsu datasheet.