RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0720006890 - Archived data from Tue, 11. August 2020 17:27:24 CEST


This is all the information about APD 0720006890. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0720006890
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 11 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6004329 V     T = -25 °C: 350.9813125 V
Voltage for Gain 150: T = +20 °C: 394.4901578 V     T = -25 °C: 358.4583514 V
Voltage for Gain 200: T = +20 °C: 398.8783658 V     T = -25 °C: 362.6774255 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587062508 V-1     T = -25 °C: 4.746229845 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.938249658 V-1     T = -25 °C: 9.354621391 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14302202 V-1     T = -25 °C: 14.3507227 V-1
Break-through voltage: T = +20 °C: 414.1401151 V     T = -25 °C: 377.8515631 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:14 CET jreher Updated box and position via API.
03. Feb 2021 18:19:55 CET jreher Updated box and position via API.
07. Oct 2020 15:46:11 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:11 CET jreher Updated APD location via API.
25. Nov 2019 17:14:35 CET jreher Updated box and position via API.
04. Jul 2019 11:11:55 CEST jreher Updated APD location via API.
18. Jun 2019 13:34:39 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 15:04:33 CEST markus.moritz
22. Jun 2016 15:13:21 CEST Tobias Imported from Hamamatsu datasheet.