RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2306024673 - Archived data from Tue, 11. August 2020 17:45:46 CEST


This is all the information about APD 2306024673. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2306024673
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 217
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.653425 V     T = -25 °C: 348.7442464 V
Voltage for Gain 150: T = +20 °C: 391.5303566 V     T = -25 °C: 356.1464648 V
Voltage for Gain 200: T = +20 °C: 395.9037363 V     T = -25 °C: 360.52145 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.694687353 V-1     T = -25 °C: 4.91779879 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.291333733 V-1     T = -25 °C: 9.482326337 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45492297 V-1     T = -25 °C: 15.97091163 V-1
Break-through voltage: T = +20 °C: 411.4125619 V     T = -25 °C: 376.2232953 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:18 CET jreher Updated box and position via API.
11. Aug 2020 17:45:46 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:08 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:23 CET jreher Updated APD location via API.
25. Nov 2019 17:27:48 CET jreher Updated box and position via API.
11. Nov 2019 18:50:21 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:28:38 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:07 CEST Tobias Imported from Hamamatsu datasheet.