RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2306024631 - Archived data from Fri, 05. February 2021 11:21:02 CET


This is all the information about APD 2306024631. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2306024631
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.831719 V     T = -25 °C: 351.3646734 V
Voltage for Gain 150: T = +20 °C: 393.6860113 V     T = -25 °C: 358.902671 V
Voltage for Gain 200: T = +20 °C: 398.0320069 V     T = -25 °C: 363.1979262 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.657857948 V-1     T = -25 °C: 4.970218384 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.236322225 V-1     T = -25 °C: 9.178048873 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48452776 V-1     T = -25 °C: 14.74526481 V-1
Break-through voltage: T = +20 °C: 414.0812147 V     T = -25 °C: 376.8692074 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:02 CET jreher Updated box and position via API.
13. Oct 2020 15:56:35 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:15 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:50 CET jreher Updated APD location via API.
25. Nov 2019 17:30:14 CET jreher Updated box and position via API.
11. Nov 2019 19:00:11 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:31:26 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:06 CEST Tobias Imported from Hamamatsu datasheet.