RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2303024365 - Archived data from Fri, 05. February 2021 11:15:56 CET


This is all the information about APD 2303024365. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2303024365
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.173285 V     T = -25 °C: 349.3369203 V
Voltage for Gain 150: T = +20 °C: 393.0537664 V     T = -25 °C: 356.8268114 V
Voltage for Gain 200: T = +20 °C: 397.445421 V     T = -25 °C: 361.0201213 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.521287872 V-1     T = -25 °C: 4.729452803 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.883527349 V-1     T = -25 °C: 9.518438129 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.52917961 V-1     T = -25 °C: 14.98632606 V-1
Break-through voltage: T = +20 °C: 412.6847855 V     T = -25 °C: 376.352407 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:31 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:15:56 CET jreher Updated box and position via API.
11. Aug 2020 17:45:29 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:39 CEST jreher Updated box and position via API.
27. Nov 2019 20:06:51 CET jreher Updated APD location via API.
25. Nov 2019 17:27:35 CET jreher Updated box and position via API.
11. Nov 2019 18:42:31 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:26:41 CET spankonin Updated APD location via API.
23. Jun 2016 11:57:59 CEST Tobias Imported from Hamamatsu datasheet.