RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2302024264 - Archived data from Wed, 07. October 2020 15:43:56 CEST


This is all the information about APD 2302024264. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2302024264
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 205
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0497637 V     T = -25 °C: 346.4308326 V
Voltage for Gain 150: T = +20 °C: 389.9160754 V     T = -25 °C: 353.8305081 V
Voltage for Gain 200: T = +20 °C: 394.3086533 V     T = -25 °C: 357.9759892 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.567876169 V-1     T = -25 °C: 4.747745806 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.943577908 V-1     T = -25 °C: 9.597528562 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84181148 V-1     T = -25 °C: 15.17286472 V-1
Break-through voltage: T = +20 °C: 409.8360372 V     T = -25 °C: 373.4666768 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:44 CET jreher Updated box and position via API.
07. Oct 2020 15:43:56 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:20 CET jreher Updated APD location via API.
25. Nov 2019 17:26:57 CET jreher Updated box and position via API.
31. Oct 2019 17:07:45 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:57:56 CEST Tobias Imported from Hamamatsu datasheet.