RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2302024260 - Archived data from Fri, 29. January 2021 10:25:21 CET


This is all the information about APD 2302024260. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2302024260
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2302024260/2004021753
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 205
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.105167 V     T = -25 °C: 346.5083486 V
Voltage for Gain 150: T = +20 °C: 389.9450646 V     T = -25 °C: 353.9282799 V
Voltage for Gain 200: T = +20 °C: 394.3230249 V     T = -25 °C: 358.0976161 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.563719417 V-1     T = -25 °C: 4.698284166 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.957232528 V-1     T = -25 °C: 9.412997645 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.86108971 V-1     T = -25 °C: 14.84691425 V-1
Break-through voltage: T = +20 °C: 409.9254923 V     T = -25 °C: 373.7279293 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:43 CET jreher Updated box and position via API.
29. Jan 2021 10:25:21 CET jreher Assigned to capsule by script
06. Oct 2020 16:50:47 CEST jreher Updated box and position via API.
11. Aug 2020 17:43:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:57 CET jreher Updated box and position via API.
31. Oct 2019 17:07:45 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:57:56 CEST Tobias Imported from Hamamatsu datasheet.