RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2302024258 - Archived data from Tue, 11. August 2020 17:43:32 CEST


This is all the information about APD 2302024258. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2302024258
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2306024677/2302024258
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 205
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0114652 V     T = -25 °C: 347.4187992 V
Voltage for Gain 150: T = +20 °C: 390.8361181 V     T = -25 °C: 354.8710801 V
Voltage for Gain 200: T = +20 °C: 395.1919412 V     T = -25 °C: 359.0519858 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.573907561 V-1     T = -25 °C: 4.692784172 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.112767322 V-1     T = -25 °C: 9.462515168 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17674124 V-1     T = -25 °C: 14.95718773 V-1
Break-through voltage: T = +20 °C: 410.2398655 V     T = -25 °C: 374.2861056 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:43 CET jreher Updated box and position via API.
11. Aug 2020 17:43:32 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:32 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:09 CET jreher Updated box and position via API.
27. Nov 2019 20:05:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:57 CET jreher Updated box and position via API.
31. Oct 2019 17:07:44 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:57:56 CEST Tobias Imported from Hamamatsu datasheet.