RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2009022111 - Archived data from Tue, 11. August 2020 17:41:27 CEST


This is all the information about APD 2009022111. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2009022111
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0718006764/2009022111
Unit: #1095 (barcode 1309012305)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 234
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9495377 V     T = -25 °C: 343.5508617 V
Voltage for Gain 150: T = +20 °C: 385.672373 V     T = -25 °C: 350.7388563 V
Voltage for Gain 200: T = +20 °C: 389.9925152 V     T = -25 °C: 354.7772861 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.739674874 V-1     T = -25 °C: 4.856961969 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.407747146 V-1     T = -25 °C: 10.0568643 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70230469 V-1     T = -25 °C: 16.17801024 V-1
Break-through voltage: T = +20 °C: 405.8465288 V     T = -25 °C: 370.016405 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:29 CET jreher Updated box and position via API.
11. Aug 2020 17:41:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:00 CEST jreher Updated box and position via API.
03. Apr 2020 09:47:24 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:18 CET jreher Updated box and position via API.
16. Jan 2020 12:06:35 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:45 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:55 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:03 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:15 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:29 CET jreher Updated APD location via API.
25. Nov 2019 17:29:05 CET jreher Updated box and position via API.
22. Oct 2019 12:56:11 CEST spankonin Updated APD location via API.
18. Oct 2019 14:06:39 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:53:47 CEST Tobias Imported from Hamamatsu datasheet.