Show Hamamatsu Avalanche Photo Diode 2008022070 - Archived data from Tue, 21. July 2020 14:34:06 CEST
This is all the information about APD 2008022070. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2008022070 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | G08 |
| Break-through voltage: | 402 V |
| Voltage for Gain 100 (T=+25°C): | 374.5 V |
| Dark current: | 19.5 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 259 |
| Position in Box: | 8 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 07. Feb 2022 10:46:38 CET | oafedulidis | Assigned to capsule by script |
| 16. Jun 2021 16:04:23 CEST | oafedulidis | Updated box and position via API. |
| 16. Jun 2021 16:00:36 CEST | oafedulidis | Updated box and position via API. |
| 16. Jun 2021 15:53:18 CEST | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 11:21:38 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:43:21 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:34:06 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:32 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:43 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:53 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:59:01 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:58:11 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:14:35 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:30:26 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 16:37:36 CEST | spankonin | Updated APD batch assignment via API. |
| 22. Oct 2019 16:18:34 CEST | spankonin | Updated APD location via API. |
| 23. Jun 2016 11:52:51 CEST | Tobias | Imported from Hamamatsu datasheet. |