RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022068 - Archived data from Wed, 27. November 2019 20:14:34 CET


This is all the information about APD 2008022068. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022068
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.1 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 259
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 10:46:47 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:27 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:40 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:21 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:38 CET jreher Updated box and position via API.
11. Aug 2020 17:43:20 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:06 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:32 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:43 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:53 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:00 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:11 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:14:34 CET jreher Updated APD location via API.
25. Nov 2019 17:30:26 CET jreher Updated box and position via API.
22. Oct 2019 16:37:35 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:18:33 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:51 CEST Tobias Imported from Hamamatsu datasheet.