Show Hamamatsu Avalanche Photo Diode 2008022058 - Archived data from Fri, 05. February 2021 11:14:38 CET
This is all the information about APD 2008022058. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2008022058 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | C12 |
| Break-through voltage: | 403 V |
| Voltage for Gain 100 (T=+25°C): | 374.8 V |
| Dark current: | 16 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 204 |
| Position in Box: | 42 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 375.0376424 V T = -25 °C: 340.943044 V |
| Voltage for Gain 150: | T = +20 °C: 382.7317653 V T = -25 °C: 348.0834081 V |
| Voltage for Gain 200: | T = +20 °C: 387.0440867 V T = -25 °C: 352.1053926 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.706208145 V-1 T = -25 °C: 5.14329367 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.351936187 V-1 T = -25 °C: 9.696602937 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.54442702 V-1 T = -25 °C: 15.48900176 V-1 |
| Break-through voltage: | T = +20 °C: 402.8308601 V T = -25 °C: 367.1846866 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 15. Nov 2022 12:55:15 CET | oafedulidis | Assigned to capsule by script |
| 01. Dec 2021 12:56:25 CET | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 11:14:38 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:43:17 CEST | jreher | Updated APD characteristics via API. |
| 16. Jan 2020 12:06:31 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:42 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:52 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:59:00 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:58:09 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:05:10 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:26:54 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 16:37:34 CEST | spankonin | Updated APD batch assignment via API. |
| 22. Oct 2019 16:17:51 CEST | spankonin | Updated APD location via API. |
| 23. Jun 2016 11:52:51 CEST | Tobias | Imported from Hamamatsu datasheet. |