Show Hamamatsu Avalanche Photo Diode 2006021909 - Archived data from Tue, 11. August 2020 17:40:53 CEST
This is all the information about APD 2006021909. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2006021909 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | D08 |
| Break-through voltage: | 406 V |
| Voltage for Gain 100 (T=+25°C): | 377.2 V |
| Dark current: | 17.2 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 235 |
| Position in Box: | 12 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 377.6162254 V T = -25 °C: 343.2226458 V |
| Voltage for Gain 150: | T = +20 °C: 385.3071638 V T = -25 °C: 350.4040352 V |
| Voltage for Gain 200: | T = +20 °C: 389.6084647 V T = -25 °C: 354.4352488 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.504260031 V-1 T = -25 °C: 4.956311477 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.752650834 V-1 T = -25 °C: 9.270671052 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.23818252 V-1 T = -25 °C: 16.68980763 V-1 |
| Break-through voltage: | T = +20 °C: 405.4048872 V T = -25 °C: 369.6083936 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 11:18:34 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:40:53 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:30:08 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:25 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:36 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:46 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:58:53 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:57:58 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:10:38 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:29:07 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 12:49:09 CEST | spankonin | Updated APD location via API. |
| 18. Oct 2019 13:56:19 CEST | jgrochowski | Updated APD batch assignment via API. |
| 23. Jun 2016 11:52:48 CEST | Tobias | Imported from Hamamatsu datasheet. |