Show Hamamatsu Avalanche Photo Diode 0718006751 - Archived data from Tue, 08. December 2020 17:11:07 CET
This is all the information about APD 0718006751. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 0718006751 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | assigned to 0718006751/2403026111 |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | blue |
| Manufacturer information: | |
| Wafer position: | C02 |
| Break-through voltage: | 407 V |
| Voltage for Gain 100 (T=+25°C): | 378.5 V |
| Dark current: | 7 nA |
| Screening Logistics: | |
| Available: | No |
| Storage Box: | 198 |
| Position in Box: | 6 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | none |
| Sent for analysis after irradiation: | none |
| Return for assembly: | none |
| Irradiation: | |
| Date: | none |
| Dose used: | none |
| Temperature: | none |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | none |
| Temperature: | none |
| Duration: | none |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 378.2440453 V T = -25 °C: 343.3542054 V |
| Voltage for Gain 150: | T = +20 °C: 386.1233478 V T = -25 °C: 350.6470767 V |
| Voltage for Gain 200: | T = +20 °C: 390.519948 V T = -25 °C: 354.7543969 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.491239419 V-1 T = -25 °C: 4.797569065 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.677130255 V-1 T = -25 °C: 9.770228965 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.90134873 V-1 T = -25 °C: 15.44229366 V-1 |
| Break-through voltage: | T = +20 °C: 405.7509454 V T = -25 °C: 369.6736875 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 11:13:54 CET | jreher | Updated box and position via API. |
| 08. Dec 2020 17:11:07 CET | jreher | Assigned to capsule by script |
| 06. Oct 2020 16:51:54 CEST | jreher | Updated box and position via API. |
| 11. Aug 2020 17:36:01 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 20:04:07 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:26:28 CET | jreher | Updated box and position via API. |
| 13. Aug 2019 14:44:25 CEST | spankonin | Updated APD batch assignment via API. |
| 22. Jun 2016 15:13:18 CEST | Tobias | Imported from Hamamatsu datasheet. |