RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2006021893 - Archived data from Fri, 05. February 2021 11:19:37 CET


This is all the information about APD 2006021893. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2006021893
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 200
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4061843 V     T = -25 °C: 342.9032856 V
Voltage for Gain 150: T = +20 °C: 385.0915887 V     T = -25 °C: 350.0692583 V
Voltage for Gain 200: T = +20 °C: 389.4043848 V     T = -25 °C: 354.1008563 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576277413 V-1     T = -25 °C: 5.10136986 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.014964304 V-1     T = -25 °C: 9.650347272 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.7249727 V-1     T = -25 °C: 15.36583375 V-1
Break-through voltage: T = +20 °C: 404.9667094 V     T = -25 °C: 369.1232554 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:55 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:19:37 CET jreher Updated box and position via API.
11. Aug 2020 17:43:43 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:24 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:24 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:34 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:45 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:52 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:56 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:11:58 CET jreher Updated APD location via API.
25. Nov 2019 17:29:36 CET jreher Updated box and position via API.
31. Oct 2019 17:09:01 CET spankonin Updated APD batch assignment via API.
22. Oct 2019 16:20:39 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:48 CEST Tobias Imported from Hamamatsu datasheet.