RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2005021827 - Archived data from Fri, 16. April 2021 22:00:41 CEST


This is all the information about APD 2005021827. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2005021827
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 353
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0445141 V     T = -25 °C: 347.4502977 V
Voltage for Gain 150: T = +20 °C: 390.8939121 V     T = -25 °C: 354.9021992 V
Voltage for Gain 200: T = +20 °C: 395.259943 V     T = -25 °C: 359.1043232 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.572908367 V-1     T = -25 °C: 4.717204727 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.024840147 V-1     T = -25 °C: 9.426444804 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.99690766 V-1     T = -25 °C: 14.74550268 V-1
Break-through voltage: T = +20 °C: 409.8054731 V     T = -25 °C: 373.6017228 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:47:11 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:00:41 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:33:32 CET jreher Updated box and position via API.
08. Oct 2020 18:14:47 CEST jreher Updated APD location via API.
17. Aug 2020 14:20:10 CEST vwerner Updated APD batch assignment via API.
23. Jun 2016 11:52:46 CEST Tobias Imported from Hamamatsu datasheet.