Show Hamamatsu Avalanche Photo Diode 2005021821 - Archived data from Tue, 11. August 2020 17:43:01 CEST
					This is all the information about APD 2005021821. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2005021821 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | E12 | 
| Break-through voltage: | 415 V | 
| Voltage for Gain 100 (T=+25°C): | 387.1 V | 
| Dark current: | 16.1 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 236 | 
| Position in Box: | 6 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | none | 
| Position in grid: | none | 
| Arrival for irradiation: | 21. Aug 2019 | 
| Sent for analysis after irradiation: | 15. Oct 2019 | 
| Return for assembly: | none | 
| Irradiation: | |
| Date: | 09. Oct 2019 | 
| Dose used: | 37 Gy | 
| Temperature: | 20 °C | 
| Position: | none | 
| Bias voltage: | none | 
| Annealing: | |
| Date: | 12. Oct 2019 | 
| Temperature: | 80 °C | 
| Duration: | 48 h | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 388.0552962 V T = -25 °C: 352.2638893 V | 
| Voltage for Gain 150: | T = +20 °C: 395.8969159 V T = -25 °C: 360.1606432 V | 
| Voltage for Gain 200: | T = +20 °C: 400.1608678 V T = -25 °C: 364.7763947 V | 
| Gain/Voltage slope at M = 100: | T = +20 °C: 5.159873107 V-1 T = -25 °C: 4.796521543 V-1 | 
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.743730933 V-1 T = -25 °C: 8.631841042 V-1 | 
| Gain/Voltage slope at M = 200: | T = +20 °C: 13.3884434 V-1 T = -25 °C: 14.81545542 V-1 | 
| Break-through voltage: | T = +20 °C: 416.6536566 V T = -25 °C: 378.7828056 V | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 11:18:41 CET | jreher | Updated box and position via API. | 
| 11. Aug 2020 17:43:01 CEST | jreher | Updated APD characteristics via API. | 
| 21. Jul 2020 14:30:19 CEST | jreher | Updated box and position via API. | 
| 16. Jan 2020 12:06:20 CET | jreher | Updated date sent for analysis after screening via API. | 
| 16. Jan 2020 12:04:30 CET | jreher | Updated annealing info via API. | 
| 16. Jan 2020 12:01:40 CET | jreher | Updated irradiation info via API. | 
| 16. Jan 2020 11:58:48 CET | jreher | Updated arrival for irradiation via API. | 
| 16. Jan 2020 11:57:48 CET | jreher | Updated arrival for irradiation via API. | 
| 27. Nov 2019 20:10:49 CET | jreher | Updated APD location via API. | 
| 25. Nov 2019 17:29:12 CET | jreher | Updated box and position via API. | 
| 22. Oct 2019 16:36:26 CEST | spankonin | Updated APD batch assignment via API. | 
| 22. Oct 2019 16:17:08 CEST | spankonin | Updated APD location via API. | 
| 23. Jun 2016 11:52:46 CEST | Tobias | Imported from Hamamatsu datasheet. |