Show Hamamatsu Avalanche Photo Diode 2005021813 - Archived data from Tue, 11. August 2020 17:43:00 CEST
This is all the information about APD 2005021813. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2005021813 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | C11 |
| Break-through voltage: | 413 V |
| Voltage for Gain 100 (T=+25°C): | 384.8 V |
| Dark current: | 7 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 236 |
| Position in Box: | 1 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 385.1439815 V T = -25 °C: 349.569767 V |
| Voltage for Gain 150: | T = +20 °C: 393.0412084 V T = -25 °C: 357.1142587 V |
| Voltage for Gain 200: | T = +20 °C: 397.4447554 V T = -25 °C: 361.3796447 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.530582696 V-1 T = -25 °C: 4.63597906 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.875088156 V-1 T = -25 °C: 9.110685675 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.51421821 V-1 T = -25 °C: 14.20260192 V-1 |
| Break-through voltage: | T = +20 °C: 413.0508576 V T = -25 °C: 377.0612369 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 11:18:40 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:43:00 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:30:18 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:19 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:30 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:40 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:58:48 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:57:47 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:10:49 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:29:11 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 16:35:52 CEST | spankonin | Updated APD batch assignment via API. |
| 22. Oct 2019 16:17:08 CEST | spankonin | Updated APD location via API. |
| 23. Jun 2016 11:52:46 CEST | Tobias | Imported from Hamamatsu datasheet. |