RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2003021704 - Archived data from Tue, 11. August 2020 17:42:50 CEST


This is all the information about APD 2003021704. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2003021704
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.4 V
Dark current: 10 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 252
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7561011 V     T = -25 °C: 343.5756111 V
Voltage for Gain 150: T = +20 °C: 386.7122196 V     T = -25 °C: 350.9616617 V
Voltage for Gain 200: T = +20 °C: 391.1574363 V     T = -25 °C: 355.1227888 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.632547873 V-1     T = -25 °C: 4.703833206 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.062143475 V-1     T = -25 °C: 9.502240237 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01731373 V-1     T = -25 °C: 14.91045332 V-1
Break-through voltage: T = +20 °C: 406.9948918 V     T = -25 °C: 370.7368446 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:52:57 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:20:47 CET jreher Updated box and position via API.
11. Aug 2020 17:42:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:56 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:16 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:26 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:36 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:44 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:43 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:13:29 CET jreher Updated APD location via API.
25. Nov 2019 17:30:05 CET jreher Updated box and position via API.
22. Oct 2019 16:35:04 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:15:27 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:43 CEST Tobias Imported from Hamamatsu datasheet.