Show Hamamatsu Avalanche Photo Diode 2003021670 - Archived data from Fri, 18. December 2020 13:59:26 CET
This is all the information about APD 2003021670. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2003021670 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | D09 |
| Break-through voltage: | 408 V |
| Voltage for Gain 100 (T=+25°C): | 379.5 V |
| Dark current: | 4.7 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 252 |
| Position in Box: | 16 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 380.3577689 V T = -25 °C: 344.8388985 V |
| Voltage for Gain 150: | T = +20 °C: 388.2546015 V T = -25 °C: 352.2170878 V |
| Voltage for Gain 200: | T = +20 °C: 392.6447672 V T = -25 °C: 356.3730041 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.446844681 V-1 T = -25 °C: 4.969137073 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.665886612 V-1 T = -25 °C: 9.205453518 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.00526757 V-1 T = -25 °C: 16.41444258 V-1 |
| Break-through voltage: | T = +20 °C: 407.7422123 V T = -25 °C: 371.4395029 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 09. Feb 2021 11:21:00 CET | jreher | Assigned to capsule by script |
| 05. Feb 2021 11:20:44 CET | jreher | Updated box and position via API. |
| 18. Dec 2020 13:59:26 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:42:43 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:32:53 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:13 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:23 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:34 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:58:41 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:57:40 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:13:26 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:30:03 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 16:34:29 CEST | spankonin | Updated APD batch assignment via API. |
| 22. Oct 2019 16:15:24 CEST | spankonin | Updated APD location via API. |
| 23. Jun 2016 11:52:42 CEST | Tobias | Imported from Hamamatsu datasheet. |