RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0718006718 - Archived data from Fri, 05. February 2021 11:13:23 CET


This is all the information about APD 0718006718. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0718006718
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 14.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 194
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1774258 V     T = -25 °C: 343.2351186 V
Voltage for Gain 150: T = +20 °C: 385.9933057 V     T = -25 °C: 350.5186436 V
Voltage for Gain 200: T = +20 °C: 390.3538392 V     T = -25 °C: 354.6012531 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.578999988 V-1     T = -25 °C: 4.912731386 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.004284349 V-1     T = -25 °C: 9.11421148 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96772931 V-1     T = -25 °C: 16.24603107 V-1
Break-through voltage: T = +20 °C: 400.947881 V     T = -25 °C: 369.6085237 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:12:28 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:13:23 CET jreher Updated box and position via API.
11. Aug 2020 17:35:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:24 CET jreher Updated APD location via API.
25. Nov 2019 17:26:09 CET jreher Updated box and position via API.
16. Aug 2019 12:20:58 CEST jreher Updated APD location via API.
09. Aug 2019 17:01:42 CEST spankonin Updated APD batch assignment via API.
31. Jul 2019 14:43:37 CEST markus.moritz
22. Jun 2016 15:13:17 CEST Tobias Imported from Hamamatsu datasheet.