RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0718006709 - Archived data from Fri, 05. February 2021 11:13:22 CET


This is all the information about APD 0718006709. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0718006709
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 19.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 194
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8632658 V     T = -25 °C: 348.3583459 V
Voltage for Gain 150: T = +20 °C: 391.6744971 V     T = -25 °C: 355.7415552 V
Voltage for Gain 200: T = +20 °C: 396.0118671 V     T = -25 °C: 359.8656281 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.649898913 V-1     T = -25 °C: 4.792496825 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.328498149 V-1     T = -25 °C: 9.743403468 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50340729 V-1     T = -25 °C: 15.50272998 V-1
Break-through voltage: T = +20 °C: 408.7668913 V     T = -25 °C: 375.1877772 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:01:30 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:13:22 CET jreher Updated box and position via API.
11. Aug 2020 17:35:29 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:23 CET jreher Updated APD location via API.
25. Nov 2019 17:26:09 CET jreher Updated box and position via API.
16. Aug 2019 12:20:57 CEST jreher Updated APD location via API.
09. Aug 2019 16:47:36 CEST jreher Updated APD batch assignment via API.
09. Aug 2019 16:41:28 CEST jreher Updated APD batch assignment via API.
09. Aug 2019 16:35:29 CEST jreher Updated APD batch assignment via API.
31. Jul 2019 14:38:51 CEST markus.moritz
22. Jun 2016 15:13:17 CEST Tobias Imported from Hamamatsu datasheet.