RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021553 - Archived data from Tue, 11. August 2020 17:46:52 CEST


This is all the information about APD 2001021553. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021553
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 20.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 206
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1046667 V     T = -25 °C: 350.0761117 V
Voltage for Gain 150: T = +20 °C: 393.9083899 V     T = -25 °C: 357.5918724 V
Voltage for Gain 200: T = +20 °C: 398.2380124 V     T = -25 °C: 361.7862932 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.591982199 V-1     T = -25 °C: 4.811645584 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.10247092 V-1     T = -25 °C: 9.719011462 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27168011 V-1     T = -25 °C: 15.45144295 V-1
Break-through voltage: T = +20 °C: 413.2738901 V     T = -25 °C: 377.0163919 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:50 CET jreher Updated box and position via API.
11. Aug 2020 17:46:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:30 CET jreher Updated APD location via API.
25. Nov 2019 17:27:02 CET jreher Updated box and position via API.
25. Nov 2019 14:20:16 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:19:22 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:42 CEST Tobias Imported from Hamamatsu datasheet.