RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0717006700 - Archived data from Tue, 11. August 2020 17:57:06 CEST


This is all the information about APD 0717006700. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0717006700
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 78
Position in grid: 10
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 388.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.735153 V     T = -25 °C: 352.9954688 V
Voltage for Gain 150: T = +20 °C: 396.6134571 V     T = -25 °C: 360.4044923 V
Voltage for Gain 200: T = +20 °C: 400.9769734 V     T = -25 °C: 364.5601422 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.693546998 V-1     T = -25 °C: 4.91615944 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.321954241 V-1     T = -25 °C: 9.073428248 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5498485 V-1     T = -25 °C: 16.13539591 V-1
Break-through voltage: T = +20 °C: 416.629614 V     T = -25 °C: 380.081523 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:58 CET jreher Updated box and position via API.
11. Aug 2020 17:57:06 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:53 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:44 CEST jreher Updated box and position via API.
19. Dec 2019 15:52:01 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:49 CET jreher Updated box and position via API.
23. Aug 2017 15:53:23 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:11:33 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:50:11 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:14 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:17 CEST Tobias Imported from Hamamatsu datasheet.